Tagged : Utah Road Construction

Found 1 blog entry tagged as "Utah Road Construction".

We found out almost 2 years ago that UDOT would undertake a 2-year project to improve transportation along 11400 S.

UDOT announced yesterday that the 11400 South bridge over the Jordan River, at 700 West, is now open. Construction is still underway in some places, but at least one lane will remain open in each direction through the spring. You should still use caution in the area and watch for shifting lanes and construction equipment near the railroad bridge. Speed limits are reduced to 30 mph between 1300 W. and 3600 W.  

The total project, which is 98% finished, includes continuing 11400 South from 700 West to 1300 West and widening the road to five lanes (four traffic lanes and a median). They have improved pedestrian structures and added

1,551 Views, 0 Comments